HAESN 81-02-29-2001 Part 29. Tunnels and Metros
Please sign in so that we can notify you about a reply
State estimated standards state elemental estimates for construction and special construction work (hereinafter referred to as the GESN) are intended to determine the need for resources (labor costs of workers, engineers, operating time of construction machines and mechanisms, material resources) in the implementation of construction and special construction work And for the preparation of estimated calculations (estimates) on their basis for the production of these works by resource and resource-index methods
Cover:
Cover:Soft
Category:
- Category:Business & Money
- Category:Engineering & Transportation
ISBN:
ISBN:978-5-91418-492-3
No reviews found