Stamp-45-off-English

Final works during the construction of a productive well. Teaching manual

Write a review
Old price: 98.50
54.17
You save: 44.33 (45%)
10 days
44063614
Отправка в течение 12-17 рабочих дней
+
Author:Babayan Eduard Vartanovich
Cover:Hard
Category:Engineering & TransportationReference books
ISBN:978-5-9729-0954-4
Dimensions: 153x23x217cm
The basics of designing the design of the well -tied well and its towers and, accordingly, technology and technology of fastening and tamponing materials are given. Technological operations on the primary and secondary opening of productive layers, methods for assessing the quality of opening of the layers at each stage of the construction of the well, as well as assessing the quality of the tightness of a drilled well, are considered. Methods of testing the opened productive horizons and a call of the influx in the conditions of abnormally high and low layer pressures are set out.
For students of oil and gas areas of training. It can be useful to engineers in drilling and the development of oil and gas wells
Author:
Author:Babayan Eduard Vartanovich
Cover:
Cover:Hard
Category:
  • Category:Engineering & Transportation
  • Category:Reference books
ISBN:
ISBN:978-5-9729-0954-4

No reviews found